Quantcast Figure 28. Schematic diagram of brush layering. (from Leiser, 1983)

 
  
 
Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 28. Schematic diagram of brush layering.
(from Leiser, 1983)
Figure 29. Installed section of brush layering. Note that
brush has leaves because of a workshop setting. Normally,
the brush would be without leaves because of installation
during the dormant season.
B-48

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +