Quantcast Figure 39a. Schematic of wattling bundle with preparation specifications. (from Leiser, 1983)

 
  
 
Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 39a. Schematic of wattling bundle with preparation
specifications. (from Leiser, 1983)
Figure 39b. Procedures for installing wattling bundles on slope
in the bank zone. (from Leiser, 1983)
B-62

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +