Quantcast Figure 40. Schematic illustration of live fascine bundles with coir rope mesh fabric and long straw installed between the bundles

 
  
 
Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 40. Schematic illustration of live fascine bundles with coir rope mesh fabric
and long straw installed between the bundles. (from US Army Corps of Engineers,
Nashville, 1993; schematic drawn by Robin B. Sotir & Associates, 1993)
B-64

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +