Phosphorus Loading to J. Strom Thurmond Lake
2e+5
PRE-RBR
.
UNIMPOUNDED
Max.
Max.
1e+5
POST-RBR
M in.
Mi n .
(Impounded)
Max.
M in.
0e+0
Sava1 n ah
2
Bro ad 3 iver , GA
n
River
at
RBR sit e
R
Source (tributary)
Figure 1.2.8 Consequence of construction of Richard B. Russell Lake on phosphorus
loading to J. Strom Thurmond Lake, just downstream
1.2-20

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business