Stratified Sampling Example
Objective: Calculate nutrient load contributed by the major tributary to a flood control project.
Sampling Design: Divide the target population into two strata based on flow conditions.
High flow period: Mar - May --- 92 days, 70% of the water load
Low flow period: Jan - Feb, Jun - Dec --- 273 days, 30% of the water load