5.1.1.1 Required Project Lifespan 
This factor will determine the degree of importance of the durability of alternative 
methods to a particular project. Required project lifespan is seldom truly quantifiable, even 
though those projects which require a formal economic analysis must be assigned a specific 
project lifespan. In practice, the selection of techniques usually involves only a qualitative 
assessment of required project lifespan, a choice between a "short-term" or a "long-term" 
lifespan. 
Two examples of situations involving only a short-term required project lifespan are: 
Emergency stabilization during an unusual flow event, which requires 
immediate action under conditions not permitting the design and construction 
of a permanent solution, conditions which may be so rare as to not justify a 
permanent project. 
Local stabilization on a rapidly migrating stream where the attack at the area 
of concern will be of short duration, and the probability of severe attack 
occurring at the same point in the foreseeable future is low, or at least 
acceptable. 
The extreme case of required project lifespan being long-term is the most common 
situation. When in doubt, a long-term project lifespan should be assumed, since labor and 
equipment costs are usually the most expensive part of the project, and a small premium for 
durable materials will usually provide a cost-effective increase in the factor of safety. 
A classification of intermediate project lifespan may be appropriate in special cases: 
When an eroding channel is to be stabilized with the expectation that a future 
project will result in the relocation of either the stream channel or the 
endangered structure. 
When a project for stabilizing a local erosion problem will eventually be 
endangered from downstream by channel degradation or from upstream by a 
migrating bend. This factor is, therefore, related to the determination of 
project components, and to the determination of upstream and downstream 
limits of the project, discussed in 6.1.1. 