Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 8. Photo of weighted rock toe revetment extending up the
bank. It extends about 1/3 the distance up the bank. This photo
shows the stream above low-flow conditions.
Figure 9. Photo of bioengineering project on upper Missouri River where
large rock (1.5 Tons/lin ft) was used as toe protection below large coir-
covered haybales, also forming part of the toe.
B-26

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business