Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 24a. Coir geotextile roll being installed along a streambank
in Germany.
Figure 24b. Coir roll a month or so after planting.
B-39

 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business