Project
Owner
Turbines
Aeration Features
DO Uptake
(mg/L)
Type
No.Units
Power
(MW)
Rapide Croche
*
1
0.8
auto-venting thru vacuum breaker
1.5
Rat Rapids
*
Francis
4
0.32
auto-venting thru vacuum breaker
0.8
R.L. Harris
Alabama Power
Kaplan
2
67.5
auto-venting thru air distribution conduit with draft tube deflectors
2.0
Rothschild
*
Francis
6
0.8
auto-venting thru vacuum breaker
1.5
Safe Harbor
Pennsylvania Power & Light
*
*
*
draft tube
*
Shepaug
Connecticut Light & Power
Kaplan
1
42.0
forced aeration thru draft tube
2.0
South Holston
TVA
Francis
1
36.2
auto-venting thru vacuum breaker and bypass conduit
2.0
Tenkiller Ferry
USACE
Francis
2
28.3
auto-venting thru vacuum breaker with hub baffles and bypass conduit
*
Tims Ford**
TVA
Mixed Flow
1
*
forced aeration thru vacuum breaker
*
Watauga
TVA
Francis
2
25.7
auto-venting thru vacuum breaker with hub baffles and bypass conduit
2.0
Winfield
American Electric Power Service
Kaplan
3
6.15
auto-venting thru vacuum breaker
3.0
Wyle
Duke Power
Francis
4
15.0
auto-venting thru vacuum breaker
0-2
Youghiogheny
*
*
1
*
forced aeration thru draft tube
2-5
*Missing Information
**Original Turbines
4.7-15