M
a
n
u
a
l
NCACSP
Averaqe Cost Per
Unit
XXIX.
Riparian
Buffer
a.
Grading (designate
element:
from
Section C, II)
b.
Vegetation (designate
elements
from Section C, I)
Pipe drops and surface inlets
C.
(designate elements from
Section C, VI)
d.
Animal guard (pre-fabricated
flap gate type)
each
xxx.
O d o r Control
Management
System
a.
Grading (designate
elements
from
Section C, II)
Vegetation (designate
elements
from Section C, I)
C.
Pipe drops and surface inlets
(designate elements from
Section C, VI)
d.
Animal guard (pre-fabricated
flap gate-type)
each
e.
Pipe and fittings (designate
elements from Section C,
xXx1.
Insect Control Practice
75% of actual
Requires approval by the
cost with
Technical Review Committee.
receipts
xXx11.
Streambank
Stabilization
a.
Vegetation (designate
elements
from Section C, I)
Tree/shrub
establishment
75% of actual
cost with
receipts
Stone (designate elements
C.
from Section C, VII)
July
1997
Page V I I - 2 3