COMPONENTS WHICH ARE COMMON TO TWO OR MORE PRACTICES
I.
Vegetation
a.
Materials for establishment of perennial
grasses and/or legumes
For seeding
Waterways, Diversions, Field Borders, Filter
Strips, Dams, Sediment Basins, and Critical
Area Planting. Price includes seed, lime and
fertilizer according to NC Technical Guide
Section IV 342-11, and costs associated with
applying materials.
Accessible with conventional
6.00 per ac.
equipment (see Table 1)
2.
Not accessible or practical
per ac.
with conventional
equipment due to steepness of
slope.
Requires Hydro-seeding.
preparation
50.00 per ac.
harrowing and debris removal per
NC Technical Guide, Section IV,
342-11-3, not to be used where land
smoothing or grading of the site has
resulted in satisfactory seedbed.)
Materials
establishment of
C.
144.00 per ac.
perennial grasses and/or legumes
for seeding strips,
conversion and lounging areas
(price includes seed, lime and
fertilizer according to NC Technical
Guide, Section IV, 512-2 and 512-3,
and costs associated with
application materials).
d.
preparation for strips or
26.00 per ac.
conversion
harrowing, and debris removal
according to NC Technical Guide,
Section IV, 512-l. Not to be used
where land smoothing of the site has
resulted in proper seedbed).
indicates element is not included in area's average cost
list and approval to use this element must be given by the Area
Office.