NCACSP Manual
Cost Per Unit
d.
Concrete used in lieu. of sand-cement bag
and for anti-floatation
8.00
cu. yd.
l
e.
Aluminum
5.00 sq.
f.
(fabric
filter
cloth)
yd.
2.00
Stone
(designate
elements
from
Section
C,
VII)
h.
Aluminum
anti-seep collars
Pipe
Diameter
Per
Collar
12
90.00
2.
24
110.00
3.
30
125.00
4.
36"
145.00
5.
42
180.00
6.
48"
205.00
7.
54
230.00
8.
260.00
9.
66"
300.00
10.
72
330.00
XXVIII.
Roofed
Agri-Chemical
Handling
Facility
a.
Building structure (includes
roof, posts, siding, labor and
related items)
8.00 sq. ft.
b.
Floor
1.
Concrete and steel (designate
elements from Section C, IV)
2.
Thor-o-seal
to
coat
sumps
75 % of actual
cost
with receipts
3.
Sealer
for
floor
75% of actual cost
with receipts
July