N
C
A
C
S
P
M
a
n
u
a
l
Averaqe Cost Per Unit
other elements of a waste application system.
Cost sharing
on fencing as related to this practice is not allowed.
Type of system must-be
on CPO, ie: center pivot,
traveling gun, solid set, underground main and hydrant,
honey wagon, mobile irrigation system, etc.
Applicant must sign statement reflecting that they are
responsible for the maintenance/replacement of all equipment
at their expense for the ten year life of the practice.
Invoices for every element must be submitted with the
Request for Payment.
Wetlands constructed for animal waste utilization are part
of the NCACSP as specified in the December 13, 1990 memo to
all Districts. Until "Standards" are established,
constructed wetlands will be implemented at 75% of the
actual cost and invoices will be included with the request
for payment.
XXI.
Controlled Livestock Lounging Area
a.
Stone (designate elements
from Section C, VII)
b.
(fabric filter cloth)
$ 2.00 sq. yd.
Grading (designate elements
from Section C, II)
Vegetation (designate elements
from Section C, I)
Livestock exclusion (designate
elements from Section B, XI)
f.
Concrete (designate eiements
from Section C, IV)
Filter strip (designate elements
from Section B,
h.
Sacrifice area shall be installed according
to heavy use area
Standard 561).
July
Page
VII-17