M
a
n
u
N Ca C S P
l
A
Cost Per Unit
Components of Waste Management Structures/Systems
a.
Clearing (wooded areas
0.00 per ac.
Excavation for fill for holding
ponds, lagoons, etc. (designate
elements from Section C, III)
Filter strip for waste water treatment
C.
(designate elements from Section B,
d.
Vegetation (designate elements
from Section C,
e.
Push-off ramp
75% of actual cost
(includes safety rail)
not to exceed ,000
charge to NCACSP
Livestock exclusion (designate
elements from Section B, XI)
Concrete and block (designate
elements from Section C, IV)
Collection tank for temporary storage
and transfer of liquid animal waste
(must meet state specifications)
1.
gallon concrete tank
(including installation)
6.00 each
2.
1,500 gallon concrete tank
(including installation)
599.00
each
i.
2.00 sq. yd.
Pressure treated lumber
(includes fasteners and labor)
a.
Boards
70 bd. ft.
x
post
1.50
x 6" post
1.75 L.
6" x
post
2.00
k.
Pipe and fittings (designate
elements from Section
July
Page
VII-13