Averaqe Cost Per Unit
Bent support
$ 50.00 each
Pump
75% of actual cost
system (for waste handling)
with engineer's
approval
250.00 each
protection may be used in lieu of
fiberglass housings with approval from
the Area Office. 'Cost Share shall be
75% of actual cost not to exceed the
n.
Roof gutters
Seamless aluminum
5
1.75 L.
6
2.00 L.
Assembled sections of aluminum or vinyl
2.
5
1.20 L.
6
1.40 L.
Downspout
3.
1.00
Metal Fabrication (includes
0.
75% of actual cost
all structural steel materials,
with engineer's
fabrication and installation
approval
labor)
XVI.
Dry Stack/Litter Storage Facility with roof (Maximum size
cost-shared is based on storage required in waste
utilization plan, average stacking height of 5 feet.)
a.
Totally wooden structure.
Poultry
structure built in
1.
combination with concrete slab
(includes grading, concrete, roof,
components of the dry stack).
2.10 cu.
July
1997
Page
VII-14