NCACSP
Cost Per Unit
XII.
Spring Development (from water source
maximum of 2 spring
to junction box
developments per trough/tank
to NCACSP)
a_
Excavation for spring
$
per hr.
development (see Practice Guidelines,
Section
b.
Plastic pipe and fittings
(designate
elements from Section C,
C.
40.00 each
d.
Stone (designate elements from
Section C, VII)
2.00 sq. yd.
f.
Livestock exclusion (designate
elements from Section B, XI)
XIII.
Trough or Tank (from junction box
to overflow outlet) (see Practice
Guidelines, Section
a.
Pipe and fittings
(designate elements from
Section C,
b.
Watering tanks
75% of actual cost
not to exceed 0
charge to NCACSP
C.
2.00 sq. yd.
d.
Stone (designate elements
from Section C, VII)
e.
Vegetation (designate elements
from Section C, I)
f.
Animal guard
4.00 each
flap gate type)
Brass automatic float valve
18.00 each
July
Page
VII-10