Average Cost Per Unit
2.
Dairy/Beef
a.
Wooden structure'
$ 7.00 sq.
b.
Concrete (designate elements
from Section C, IV)
Grading of site (designate
elements from Section C,
Earth fill (designate elements
from Section C, III)
e.
Stone (designate elements
from Section C, VII)
f.
Steel, reinforcing for concrete
structures (includes wire
fabric and rebar)
per lb.
Sub-surface drain (designate
elements from Section C,
b.
Reinforced concrete or block walls
Framing and roof (area within walls
and within ends of roofed area)
2.00 sq.
2.
Concrete or block (designate
elements from Section C, IV)
3.
Grading of site (designate
elements from Section C, II)
4.
Steel, reinforcing for concrete
structures (includes wire
fabric and rebar)
per lb.
Metal fabrication structure
C.
(includes all structural steel,
grading, and all other necessary
components of the dry stack)
Concrete for slab (designate
elements from Section C, IV)
July
Page
VII-15