N
C
A
C
S
P
M
a
n
u
a
l
Cost Per Unit
2.
Steel,
for concrete
structures (includes wire
fabric and rebar)
74 per lb.
l
XVII.
Slurry Storage Structure
a.
Mechancial Equipment
75% of actual cost
(agitator, sidemount pump,
with engineer's
overtop kit, knife valve)
approval
b.
Engineered Foundation
75% of actual cost
(design, excavation,
with engineer's
compaction gravel, crank
approval
nozzle installation, sealing
strip, floor penetrations.
installation, sump forming,
concrete
concrete foundation
floor, reinforcement steel,
steel starter ring etc.)
Slurry tank
C.
75% of actual cost
with engineer's
approval
d.
Pump (chopper/pit)
75% of actual cost
with engineer's
approval
Pipe (designate elements from
Section
Invoices for every item must be submitted with the
Request
for
Payment.
XVIII.
Poultry Cornposter
Cost includes only
3.00 cu.
lumber and roof. (For site grading, concrete
pad, etc., designate elements from Section C)
XIX.
Waste Application Systems
75% of actual cost not to
exceed ,000 lifetime
charge to NCACSP
(For
0200 operations ,000 lifetime charge to NCACSP)
Includes all costs associated with equipment, materials,
construction, installation, vegetation, pumps, etc. from the
lagoon to and including the delivery system:
Cap includes
any previous payments to the applicant for pipe, hydrants or
July
Page V I I - 1 6