NCACSP
Manual
Cost Per Unit
h.
Livestock exclusion (designate
element from Section B,
Well (must include well head protection)
1.
Well construction
75% of actual cost
not to exceed
charge to NCACSP
Well head protection
2.
75% of actual cost
not to exceed
charge to NCACSP
Pumps (includes all costs
75% of actual cost
associated with pump
not to exceed 0
installation).
Applicant must
charge to NCACSP
sign statement reflecting
the
use of the pump is f o r
livestock watering ONLY.
Solar powered water pump
k.
00.00 each
(see Practice Guidelines, Section
1.
Windmills
75% of actual cost
not to exceed ,400
charge to NCACSP
Excavation, grading
a.
for FORD TYPE Stream Crossing
(based on degree of job difficulty as shown below):
Site Classifications
Degree of Job
Depth x
Difficulty
Price
Low
c 80
$ 600.00
2.
Moderate
80 to 120
800.00
3.
High
120
1000.00
Product of average depth of stream channel times the
average width of stream channel at crossing location_
July
1997
Page
VII-11