N
C
A
C
S
P
M
a
n
u
a
l
Averaqe Cost Per Unit
b.
Earth fill and excavation
PIPE CULVERT
elements
from Section
Grading and excavation
for STOCK TRAILS
C.
Improving existing trail
$
L.
2.
Developing new trail
1.50
d
2.00 sq. yd.
e.
Stone (designate elements
from Section C, VII)
f.
Vegetation (designate elements
from Section C,
Fabrication of metal anchor pins
x*
each
h.
Pipe and fittings (designate elements
from Section C,
CSP shall be asphalt
coated if more than one section is used.
Aluminum or PVC pipe may be used for this
practice.
i.
Livestock exclusion (designate elements from
Section B, XI)
For all waste management
structures, the CPO must include a
detailed sketch of the structure and location of stream
system being protected.
Signature of proper job approval
11-A.
must be included on the
A copy of the waste management plan is no longer required to
be submitted with the CPO.
However, a statement signed by
district staff which certifies that the district CPO file
contains a waste management plan that meets
standards
with original signatures and maps of fields to be applied is
required.
Form NC-ACSP-WMP is located in Section VI of this
manual.
indicates element is not included in area's average cost
list and approval to use this element must be given by the Area
Office.
July
Page VII-l.2